Search: ERB Site

Today: Sat 28th November, 2020

Navigation Menu

 
  Regulatory Framework for Mini-Grids in Zambia  
  Approved Tariff Schedule 2017  
  Impact of Load Shedding on Small Scale Enterprises  
  2019 Energy Sector Report  
  Financial Assessment Manual  
  Press Statements  
  News Archives  
  Tariff/PPA Guidelines  
  Statistical Bulletin  
  Report Repository  
  Complaint Submission  
  Board Regulatory Decisions  
  Zambia Distribution Grid Code  
  Regulating the Energy Sector  
  ERB Presence  
  ZESCO KPI FRAMEWORK: January 2017 - December 2019  
  Economic Regulation  
  Frequently Asked Questions  
  Guidelines for Siting of Filling Stations  
  Energy Efficiency Tips  
  2020 Draft Tanker List  
  Guidelines for Setting up a Rural Filling Station  
  Licensed Solar Companies  
  Draft Standards  
  Downloads  
  Publications  
  Related Links  

 :: ANNOUNCEMENTS

  PUBLICATIONS (Newsletters and Brochures)

Search for:

RERA Publication on Electricity Tariffs & Selected Performance Indicators for the SADC Region 2014  [File Size: 6.2 MB]
This RERA publication on Electricity Tariffs & Selected Performance Indicators for the SADC Region 2014 serves to support RERA’s three strategic objectives [Date Posted: 2016-10-07 16:39:03]

QUALITY CONTROL AND MONITORING GUIDELINES FOR THE ZAMBIAN PETROLEUM FUEL INDUSTRY - 2014  [File Size: 530.3 KB]
The first revision of the Quality Control and Monitoring Guidelines for the Zambian Petroleum Fuel Industry was prompted by the need to address the following... [Date Posted: 2014-10-13 12:54:32]

Newsletter January - October 2012  [File Size: 936.4 KB]
With the ushering in of the new Government the Energy Regulation Board (ERB) has embarked on a sensitisation campaign to ensure that policy makers are up to speed with key issues in the energy sector. [Date Posted: 2013-01-24 15:51:11]

Newsletter Second Issue 2010  [File Size: 2.3 MB]
During the period under review, the ERB awarded North Western Energy Corporation (NWEC) a tariff of US cents 6/kWh. NWEC provides electricity to residents of Lumwana Township in North Western Province. More details are featured in this issue. [Date Posted: 2011-04-11 14:30:37]

Newsletter September - December 2009 (3rd Issue)  [File Size: 1.0 MB]
In the wake of a tariff increment in electricity, the ERB embarked on a series of public meetings which were conducted in various parts of the country. [Date Posted: 2010-03-29 09:19:06]

Guidelines for Setting Up of Rural Filling Station  [File Size: 286.3 KB]
Zambia has a total of 215 filling stations. These facilities are usually located in major towns and metropolitan areas especially along the line of rail where Oil Marketing Companies (OMCâs) including BP, Total, Engen, Chevron and Kobil have established filling stations. [Date Posted: 2010-03-04 10:20:41]

Newsletter (The Regulator) Fourth Edition 2008  [File Size: 1.3 MB]
âFuel reductionâ was the idiom for the last quarter of 2008. Energy consumers in Zambia questioned why local fuel prices had not reduced in line with the price slump on the international market and rightly so. However towards [Date Posted: 2009-04-02 13:18:37]

ELECTRICITY CONSUMER CHARTER OF ZAMBIA  [File Size: 45.5 KB]
On 15th February 2007 Zambiaâs first ever Electricity Consumer Charter was launched by electricity consumers, ZESCO Limited and Energy Regulation Board (ERB). The launch followed the development of the charter, which involved nationwide stakeholder consultations with various stakeholders.  [Date Posted: 2009-02-11 14:28:20]

Newsletter (The Regulator) Third Edition 2008  [File Size: 648.0 KB]
In the third quarter the country experienced the highest prices ever when a barrel hit US$147 on the international market and the Republican President Levy Patrick Mwanawas SC, died at Percy Military Hospital in France on 19th August 2008. [Date Posted: 2009-02-10 18:43:10]

Newsletter (The Regulator) Second Edition 2008  [File Size: 1.5 MB]
This edition of The Energy Regulator highlights a number of initiatives that the ERB, utilities and the Zambian public put in place to cope with challenges in the energy sector. [Date Posted: 2009-02-06 19:53:44]

Newsletter (The Regulator) First Edition 2008  [File Size: 943.4 KB]
The beginning of the year heralded an era of electricity shortage in Zambia and the SADC sub region. Zambia experienced three consecutive blackouts in January on the 19th, 21st and 22nd of 2008, the national power grid failed and the whole country was plunged into darkness. [Date Posted: 2008-12-10 18:39:27]

QUALITY CONTROL AND MONITORING GUIDELINES FOR THE ZAMBIAN PETROLEUM FUEL INDUSTRY  [File Size: 285.4 KB]
In a bid to uphold the quality standards of petroleum products and strengthen monitoring systems, a Committee was formed by the petroleum industry on 13th February 2008 to review the existing processes for quality monitoring and assurance. The following report outlines findings and recommendations [Date Posted: 2008-09-30 13:11:18]

ALL YOU NEED TO KNOW ABOUT LEAD REPLACEMENT PETROL (LRP) AND UNLEADED PETROL  [File Size: 1.7 MB]
All You Need To Know About Lead Replacement Petrol (Lrp) And Unleaded Petrol [Date Posted: 2008-04-25 16:52:08]

Newsletter January - March 2007 (19th Edition)  [File Size: 0.0 KB]
On behalf of management and staff of the ERB, the Energy Regulator Sincerely welcomes the new Board, which was appointed following the expiry of the term of office for the previous Board. [Date Posted: 2007-05-24 11:23:20]

Newsletter October - December 2006 (18th Edition)  [File Size: 0.0 KB]
The issue of pricing of petroleum products has received a lot of attention from consumers in Zambia over time. The period October to December 2006 was no different from other periods with regard to pricing of petroleum products in Zambia [Date Posted: 2007-05-24 11:13:17]

You are visitor Number 633759
Contact Us Related Links Downloads Site Map
© Copyright 2005 Energy Regulation Board - Zambia. | Disclaimer | ip locator Terms of Use